Monday, 4 November 2013

Updates on Production

A quick recap and list of what we have done and what we still have to do.

Things we have done:

  • Filmed all performance shots incl. around 14 possible base tracks
  • Filmed a number of shots of the heist being planned
  • Filmed some shots of diamond imagery
Things we still have to do:
  • Film the scenes with the safe
  • Edit
  • Re-shoot any possible failed shots (possibly)
  • Film some more shots to establish clarity in the narrative (possibly)
We will be filming our safe scenes tomorrow morning during lesson time. Assuming everything goes well we can then move on to editing and putting together a rough cut/final cut. So it seems everything is under control.

No comments:

Post a Comment